Home > BPMN Standard > What is new in BPMN 2.0? – Last Remarks

What is new in BPMN 2.0? – Last Remarks

My BPMN 2.0 Overview Map

So – it is very useful to have this tool for the top-down design of process interaction now. Inversely it can be used for the validation of an already existing bottom-up modeling. In reality it will be a mixture between the two. It is of central importance to have the enforceability in mind, that is to define a process, that is actually executeable by the participants. For this the model levels serve as basis for validation.

If we go down to the technical modeling, it is now possible to model Conversations, which are groups of Message Flows, Correlations, which are assignments between a message and a process instance, Service Bindings, Data Flow, … Compared to BPMN 1.2 the DataFlow is more than an artifact now (i.e. more than just a pictogram). It has a datastructure and the Activities have DataInput and DataOutput. Also the DataObject can be used as Parameterspecification for reusable Subprocesses. The Events have been enhanced. There are complex Events, Events , that can interrupt an activity or not, it is possible to define Event-Subprocesses that run aside from the Sequence Flow.

Here some critical comments from my side may be allowed. I think the workflow type of modeling is too strong in this. First there are strong sequence flow relationships established, only to be loosened later by many Events. I think it would be better for the future to define the relationships more loosely from the beginning. For example they could be modeled as preconditions depending on the status. That is something for the future.

Personally I found the discussion around the relationship between public and private processes very fascinating. One time it seemed like we had so many problems with it, that we could not do it. And additionally to this there was the climax of the debate with the concurrent submission. We were blamed, that our model was too strict. A very good discussion! But we found a very simple and elegant solution to these problems. The sequence flow is now not so strict than it was before. It has been loosened, and the difficulties disappeared.

Furthermore one important area is to have in mind the asynchronity of messages. That can produce race conditions between messages. However this in my opinion is not mainly a technical problem, but is due to the asynchronous nature of business processes, that I hope to discuss in the Blog as well in the future. Most problems on the message technology side can be avoided on the business process design level – and that is good news.

There are more changes from 1.2 to 2.0, but in my view these were the most important.BPMN has become quite powerful. Sometimes it is not so clear as to how to solve a certain modeling problem. However the success will depend on elaborating best practices and good guidance.

My wishlist for BPMN in the future? Modeling of Interactions with and of Business Objects. Find simpler ways to model special cases. Model a Process specific  Status.

But now is the time that BPMN 2.0 has to be used and proven in practice. After that we can establish our common opinion about the wishlist for the future. It is a language. And the vocabluary is only the beginning of the process to learn to speak that language. Therefore a good coaching process is what I can recommend.

  1. No comments yet.
  1. No trackbacks yet.
You must be logged in to post a comment.